Prime Ministers of India and Bangladesh to jointly inaugurate three development projects on 1st November

Prime Minister’s Office

azadi ka amrit mahotsav

Prime Ministers of India and Bangladesh to jointly inaugurate three development projects on 1st November

These three projects have been executed through assistance from India

Three projects are Akhaura – Agartala Cross-Border Rail Link; Khulna – Mongla Port Rail Line; and Unit – II of the Maitree Super Thermal Power Plant

Projects will strengthen connectivity and energy security in the region

Posted On: 31 OCT 2023 5:02PM by PIB Delhi

Prime Minister Shri Narendra Modi and Prime Minister of Bangladesh, H.E. Sheikh Hasina will jointly inaugurate three Indian assisted development projects on 1 November 2023 at around 11 AM via video conferencing. The three projects are Akhaura – Agartala Cross-Border Rail Link; Khulna – Mongla Port Rail Line; and Unit – II of the Maitree Super Thermal Power Plant .

The Akhaura-Agartala Cross-Border Rail Link project has been executed under Government of India grant assistance of INR 392.52 crore extended to Bangladesh. The length of the rail link is 12.24 km with a 6.78 km Dual Gauge rail line in Bangladesh and 5.46 km in Tripura.

The Khulna-Mongla Port Rail Line Project has been implemented under Government of India concessional Line of Credit with a total project cost of USD 388.92 million. The project entails construction of approximately 65 kms of broad gauge rail route between Mongla Port and the existing rail network in Khulna. With this, Mongla, the second largest port of Bangladesh, gets connected with the broad-gauge railway network. 

The Maitree Super Thermal Power Project under Indian Concessional Financing Scheme loan of USD 1.6 billion, is a 1320 MW (2×660) Super Thermal Power Plant (MSTPP) located in Rampal in Khulna Division of Bangladesh. The project has been implemented by the Bangladesh-India Friendship Power Company (Private) Limited (BIFPCL), which is a 50:50 Joint Venture company between India’s NTPC Ltd and Bangladesh Power Development Board (BPDB). Unit I of the Maitree Super Thermal Power Plant was unveiled jointly by both Prime Ministers in September 2022 and Unit 2 will be inaugurated on 1 November 2023. The operationalization of Maitree Super Thermal Power Plant will enhance energy security in Bangladesh.

These projects will strengthen connectivity and energy security in the region.

***

DS/LP

(Release ID: 1973403) Visitor Counter : 336

Source Link

LEAVE A REPLY

Please enter your comment!
Please enter your name here